The carrier had data. Nobody had qualified the lane.
A first-in-human program was shipping to three investigator sites on a carrier’s generic summer pack-out. The sponsor could produce transit temperatures but not a defensible qualification for the payload, the duration or the handoffs, and a sponsor audit was six weeks out.
Two seasonal lane qualifications to ISTA 7D, a payload-specific pack-out specification, receipt and release criteria for each site, and a documentation set that tied every claim to a test, a lane and a revision.
Lanes cleared qualification inside ten weeks and the audit closed with no cold-chain findings. The transport section went into the filing referencing the study records rather than carrier promises.


